Constructed Wetland Treatment System for an Arms Manufacturer
Lonoke, Arkansas
FTN evaluated and pilot tested different treatment options and recommended a constructed wetlands system. The design included converting a portion of an abandoned 30 million gallon retention basin into a constructed wetland system. The project also included yard piping, influent and effluent flow measuring/monitoring facilities, an effluent pump station with VFD controls, and a SCADA system to control and monitor the system.
Little Rock, AR
● Fayetteville, AR
● Baton Rouge, LA
● Jackson, MS